RevoQuant

Measure once.
Measure properly.

Commission an AI-assisted, unpriced bill of quantities for a defined work package. Follow each bill item through the take-off ledger to the drawing and revision that support it.

Ceiling planEX-01 · Revision B
Room A4.80 × 3.60 m
Room B3.20 × 3.60 m
Illustrative drawing · Rectangular ceiling zones, shown schematically

Measurement evidence

Follow one ceiling item.

A two-room teaching example shows how the estimator can move from a bill quantity to the individual measurements behind it. All quantities shown here are illustrative.

Drawing and revision

Sheet EX-01, revision B, defines two rectangular rooms with the same ceiling finish. Both are included in the measure.

Measured bill

Item CL-01 brings the two net ceiling areas together. The bill carries one quantity of 28.80 m².

Read the take-off ledger

Materials planning

The bill gives net finished area. The specification, board sizes, layers and separately stated waste allowance inform any material order.

Worked measurement · Illustrative records

Inside the take-off ledger.

This stand-alone example shows how two ceiling zones reconcile to one bill item. The dimensions, sheet and references were created for this example.

Bill item CL-01

Ceiling finish to two rooms

28.80 m² net

Take-off entries supporting item CL-01 · Sheet EX-01, revision B
Take-off entrySource and locationCalculationNet area
L-01EX-01 / B
Room A
4.80 m × 3.60 m17.28 m²
L-02EX-01 / B
Room B
3.20 m × 3.60 m11.52 m²
Quantity carried to bill CL-0128.80 m²

Measurement basis   Single flat ceiling finish in each room. No openings or deductions in this example. Materials and waste are assessed separately.

Tender measurement

Define the package.

For a drylining or ceilings package, bring the drawing register, specifications and schedules. Agree the package boundaries, measurement rules and exclusions, then record queries and the professional review required for issue.

For specialist subcontractors

Outputs to agree

  • Unpriced bill of quantities
  • Detailed take-off ledger with calculations and deductions
  • Annotated drawing and revision references
  • Level 1 materials take-off where commissioned, with waste assumptions stated separately
Explore the planned self-service route

Commission a measurement brief.

  • Managed measurement and drylining pilots

    Commission a measure for an agreed package or discuss a drylining pilot. We agree the fee, timing, evidence and review responsibilities before accepting the instruction.

  • Planned platform integration

    Approved quantities are intended to support the contract and change baseline in RevoWizard, then budgets, valuations and cost-value reconciliation in VIA.