At the bill
Check whether the item combines different rooms or floors. Read the construction, unit and extent before applying a rate.
Specialist subcontractors
Before putting a rate against a drylining item, an estimator needs to see exactly what it covers. Follow a ceiling quantity from the bill to the room, the drawing issue and the detail still to resolve.
| Scope | Measured extent | Area |
|---|---|---|
| Room A | 4.80 × 3.60 m | 17.28 m² |
| Room B | 3.20 × 3.60 m | 11.52 m² |
| Bill item CL-01 | 28.80 m² | |
Commission RevoQuant to measure the agreed scope and supply an unpriced bill. Bring the package drawings, revisions and specification. Agree the technical queries, review responsibilities and any materials take-off with the measuring team.
Check whether the item combines different rooms or floors. Read the construction, unit and extent before applying a rate.
Find the entries that make up that item and the sheet and revision behind each one. The estimator can then trace a query back to the location it affects.
Keep quantities, procurement allowances and unresolved specification points visible. Agree how the estimator and reviewing QS will close the outstanding items.